Work commenced on this 12,000m² project in August 2014 with the peak man-power occurring in the first quarter of 2015. The Project was completed in August 2016. After this time Asgard were requested to remove panels to enable the moving in of client equipment and subsequently reinstalled the walls. This project was constructed in an existing facility.
Project Details
Project Name
Bulk Biologics Facility
Project Location
Raheen Bus. Park, Limerick, Ireland
Project Size
6200m²
Project Value
€16 million
Project Duration
24 months
Architect
Jacobs Engineering
Engineer
Jacobs Engineering
Main Contractor
PM Group (Managing Contractor)
Design Completed Using
Autocad 2D, Microstation, Navisworks
Cleanroom Classification
BSL 2, ISO 5-8
Project Overview


Regeneron
Provided by Asgard
Products & Services
Ceilings
11,000m² of walk-on ceilings and bulkheads. Factory formed opes for lights and grilles. 450m² non-walk-on ceiling panels.
Partitions
Fully Flush panelling system, 50mm thick to cleanrooms including 760nr fully flush windows, low-level return walls and cold weld joints. Fire rated plasterboard walls to electrical rooms.
Doorsets
Provision of 365 swing doors, 3nr rapid roll doors, 34nr pass-through hatches.
Interlocking
Design, supply, installation and commissioning of interlocking systems.
Other Works Packages
Mock-up, 200nr exit signs, 2500m of guardrails, 36nr ladders and gates, 22nr 316 grade s/s fire extinguisher cabinets.
HVAC
Supply and installation of 1100Nr HEPA filter housings, filter media and grilles.
Lighting
Supply and install 2100Nr LED light fittings including 500nr emergency battery back-ups and 6Nr EEX rated fittings.