Asgard completed the design, supply and installation of this 1,500m² Cleanroom, which included aluminium rapid roller doors, hermetically sealed sliding doors, aluminium honeycomb walk on ceilings and walls. Cleanroom Envelope construction was completed in a very fast twelve week period from commencement to meet clients requirements.
Project Details
Project Name
GSK Patch
Project Location
Dungarvan, Waterford, Ireland
Project Size
1,500m²
Project Value
€1 million
Project Duration
4 months
Architect
DJF Engineering
Engineer
DJF Engineering
Main Contractor
Sisk
Design Completed Using
Autocad
Cleanroom Classification
BSL 2, ISO 5-8
Project Overview
GSK
Provided by Asgard
Products & Services
Ceilings
1,500m² of aluminium honeycomb walk-on ceiling panels.
Partitions
2,000m² of flush metal faced panelling system 50mm thick.
Doorsets
Provision of approx 30 doors including rapid action doors, hermetically sealed sliders, and various hinged doorsets.
Interlocking
Design, supply, installation and commissioning of interlocking systems.
Electrical
Design, supply and installation of recessed stainless steel service panels, automation of sliding and rapid roller doors and their interlocking.