This €900k project was completed in a live plant and included rooms of various heights up to 6.0m. The interlocking of doorsets on this project was particularly challenging due to the fact that there were hinged GRP, sliding GRP and rapid roll doors interlocked together.
Project Details
Project Name
Baxter Healthcare
Project Size
2,000m²
Project Value
€1,5 million
Project Duration
6 months
Cleanroom Classification
ISO 8
Project Overview
Baxter
Provided by Asgard
Products & Services
Ceilings
1,600m² of fully flush long-span walk-on plank ceiling panels.
Partitions
2,000m² of metal faced fully flush FM approved panelling 50mm thick.
Furniture
Design, manufacture and installation of stainless steel step over bench.
Doorsets
Provision of approx 10 GRP doorsets, 2 sliding GRP doors and 5 rapid roll doors.
Interlocking
Design, supply, installation and commissioning of interlocking to 8 doorsets including a 5 door arrangement.
Structural
Design, supply and installation of a subgrid structure above entire ceiling including integrated handrails to the perimeter.
HVAC
Cleanroom panelled low-level extract ducts.