Asgard completed the design, supply and installation of this 4,500m² Cleanroom, which included the high specification Cleanroom Envelope, with some electrical elements, HVAC grilles, structural steel elements, etc. The project was completed in a very fast 22 week period from commencement of fit out to completion of the clean envelope.
Project Details
Project Name
Servier Packing Hall
Project Size
4,500m²
Project Value
€2 million
Project Duration
6 months
Engineer
Sepam Specialist Ltd.
Main Contractor
Sepam
Design Completed Using
Revit 2016, Navisworks, Auto CAD
Cleanroom Classification
ISO 7-8
Project Overview


Servier Packing Hall
Provided by Asgard
Products & Services
Ceilings
4,000m² of aluminium grid and 500m² of walk-on ceiling panels.
Partitions
3,000m² of flush metal faced fully flush panelling system 50mm thick.
Doorsets
Provision of approx 40 rapid action doors, 5 hermetic sliders, and 30 fully flush hinged doorsets.
Electrical
Design, supply and installation of recessed stainless steel service panels, automation of rapid roller, sliding and hinged doors and their interlocking.
Flooring
4,200m² of coloured vinyl floors and 300m² of trowel on epoxy flooring.
Furniture
Design, manufacture and installation of stainless steel furniture and bump rails.
Interlocking
Design, supply, installation and commissioning of interlocking systems.
HVAC
Design, supply and installation of low-level return airwalls.